Large flatwork paving pours utilizing high - Strength mixes engineered to provide excellent strength and durability + resistance to chemical deicers
87,600sf expansion and remodel. $32 M project utilizing high-spec interior, exterior and grout Mixes
CRAIG DOWNTOWN BUSINESS DISTRICT SIDEWALK UPGRADES
CDOT VSF EXPANSION
Utilized high-spec mixes with special application/decorative finishing techniques used
Use of high-strength CDOT-approved mixes
including use of shrink-reducing admixtures
CR 5 Stock Passes
BLM’s Northwest District Office Paving
High-strength, high spec mixes in rural areas, utilizing mid-range stabilizing admixtures
Specially engineered high-spec paving mixes designed with excellent durability and resistance to harsh freeze/thaw cycles as well as chemical deicers
Memorial Regional Health Medical Offices Building
Kum n Go – Hayden
Construction of 3-story, 60,000sf, $29M building utilizing specialty, pumpable mixes for large interior flatwork pours
Extreme cold-winter concrete batching/ pouring, including use of accelerators and high-dosage colored concrete
ROUTT COUNTY RURAL BRIDGE REPLACEMENTS
MARKET ST / HWY 13 SIDEWALK UPGRADES
Utilized CDOT-approved, high-spec mixes delivered to extremely
rural areas in the county
MARKET ST / HWY 13 SIDEWALK UPGRADES
PIONEERS MEDICAL CENTER
EASTERN RIO BLANCO RECREATION CENTER
Construction of new 90,000 s.f facility - Specialty mixes - Experience utilizing Concure admixture - Use of Type V cement
Construction of new 25,000 s.f facility - Major flatwork & foundation pours - Shot-crete utilized for construction of pool.
UTE ROAD & ROUND-A-BOUT
MEEKER ELEMENTARY SCHOOL
CDOT Approved Mixes - Colored concrete for medians & crosswalks - Tight time restraints requiring early strengths in order to open road to traffic
Construction of new 70,000 s.f facility - Tight schedules - High specifications
RIO BLANCO COUNTY JUSTICE CENTER
RIO BLANCO COUNTY RD 10 BRIDGE REPLACEMENT
Construction of new facility, integrating existing historic building - High spec, cold weather concrete - Use of conveyor trucks for difficult access within existing structure - Re-processed asphalt & concrete removed fr
Replacement of bridge in remote area - Provided specialty aggregate - CDOT approved mix designs - Met stringent CDOT specifications
TOWN OF RANGELY -- TRAILS PROJECT
MEEKER & MCBRYDE SUBSTATIONS
Construction of new bike path through west Rangely - Donation of materials to create veteran's memorial in Hefley Park - Specialty concrete colors - Use of conveyor trucks
Construction of 2 electric substations and transmission lines connecting the two - 5,000 cy - Extreme mountain conditions - Rugged access
COLORADO NORTHWEST COMMUNITY COLLEGE
CRAIG CAMPUS
CNCC -- RECTOR HALL ADDITION
RANGELY CAMPUS
Construction of new 78,000 s.f campus facility - Major flatwork & wall pours ranging from 300-600cy
Unique mix designs requiring high slump / high strength for caissons & complicated grade beams - Slab pours completed during extreme sub-zero temps - Use of heated aggregates & water in order to meet temperature requirem